INVERNESS PARK, Marin County — October 31, 2026. Construction plans for the replacement of the Green Bridge over Lagunitas Creek have direct implications for the water system serving Inverness Park. According to North Marin Water District, the community receives drinking water through a crucial eight-inch transmission pipeline connected to the existing bridge.
How will the water keep flowing?
The water district says it is coordinating with Caltrans to install a temporary bypass pipeline before the existing bridge-mounted line is removed. Caltrans is responsible for a protective casing across the creek, which the district can use for its temporary line. This work is intended to preserve service during bridge replacement rather than leave customers without a planned supply route.
What is the permanent upgrade?
The district plans to attach a new pipe to the replacement bridge, with expansion joints designed to tolerate seismic movement. Additional bypass fittings would offer a way to connect temporary service if the permanent line ever needs repair. Preparatory valves were installed beginning in September 2025.
Is the replacement completed?
The public project description concerns planned construction and does not establish that every pipe segment has been placed or that all work has concluded. Residents should check utility notices before assuming any scheduled interruption or completion date.
Source: North Marin Water District, Lagunitas Bridge Pipeline project overview, current in October 2026.
Support Inverness Park News
Choose how to support Inverness Park News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “Inverness Park News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from Inverness Park News
- Inverness Park Water Bills: North Marin District Rates Effective July 1, 2026 →
- West Marin Emergency Coordinator Contract Covers Inverness Park Through December 2028 →
- Inverness Park Residents Can Report Road Hazards and Blocked Drains via FixItMarin →
- Inverness Park Households May Be Affected by Marin’s Overhaul of Septic System Rules →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.